Hi Anu,
Process should be
1.Delete PSA and InfoProvider contents.
2.Delete Init Selection in InfoPackge --> Schedule --> Initialization option for Source System --> Change Request status as RED and then delete.
3. Do Init without delta transfer in Info Package
4. Create a new InfoPackage with Repair Full load and do load
5. Then use delta load in Process chain.
Thanks,
Asam