Hi,
we are trying to set up automatic ROP planning (MRP Type VM) and this is what I have set up so far
MRP Parameters with the MRP Type and the forecasting tab with the forecast generated based on consumption values. If my understanding is right, The next step would be to copy the forecast for the MRP to recognize it as a requirement. I am trying to do it thru MD70 by giving the Material #, Plant etc and the output indicates it is not transferred. I checked the Stock/Req list also and there is no demand created for that material. I am not sure what I am missing? Can anybody please guide me
thanks
Sachin